SAL Terminal Inland

Saltrigg

A small upland terminal on a steeply-graded line. Trains are limited to 1,600 t here, so Saltrigg services run shorter and more often.

06:00-20:00 Gate hours
3 Physical links to the rest of the network
54.11, -2.78 Position used by the routing engine
LB-01 Transit from here to every other terminal
Fastest published route to each terminal on the network
Destination Via Legs Distance Transit
Ondermere 1 163 km 7h 24m
Fenwick Yard 1 160 km 7h 35m
Thorne Vale 1 164 km 7h 39m
Dunmore Quay FEN 2 219 km 10h 02m
Halgate THV 2 265 km 10h 46m
Merrow Junction OND 2 256 km 12h 54m
Ravensworth OND · MER 3 326 km 15h 32m
Kelvedon Gateway THV · HAL 3 427 km 17h 09m
Ashport Deepwater OND · MER 3 473 km 17h 53m
Bexley Cross OND · MER · KEL 4 565 km 20h 53m
Cawdor Point OND · MER · KEL 4 627 km 21h 53m

A small upland terminal on a steeply-graded line. Trains are limited to 1,600 t here, so Saltrigg services run shorter and more often.

Handling

Two reach stackers Gate hours are 06:00-20:00.

Position on the network

Saltrigg has 3 physical links to the rest of the network. The transit table above is computed for every one of the other eleven terminals; it is not a published list that somebody maintains by hand.