Case studies
named figures
On the network
What moved, on which lane, and what changed as a result.
A grain marketing cooperative
Four months of the year, this terminal does three times the work
A seasonal flow does not fit an annual timetable. We stopped trying to make it.
A vehicle assembly plant
A two-hour delivery window, three times a day, for four years
Line-side delivery is the hardest promise in freight, because the cost of being wrong is not a late box — it is a stopped…
A grid equipment manufacturer
One 41-tonne transformer, and the only pad that would take it
Most freight problems are ordinary. This one was a single indivisible object heavier than any other terminal on the network could lift.
A regional brewery, 240,000 hl a year
Taking eleven days of stock out of a brewery
The customer did not need faster freight. They needed freight that arrived when it said it would, so they could stop insuring against it…