LB-C12 Scheduled service Daily, August to November. Three times weekly out of season.

Corridor 12 — the Halgate harvest flow

The only seasonal service on the network. Halgate moves more than three times as much freight in October as it does in March, and the timetable admits it.

12h 37m Published terminal-to-terminal transit
380 km Routed distance, 1.23 times the straight line
92.4% Arrivals inside the window, rolling twelve months
LB-01 Where the clock goes computed, not quoted
Halgate to Ashport Deepwater, leg by leg
# Leg Mode Distance Circuity Running
Receipt, plan and lift at Halgate 3h 00m
1 Halgate → Merrow Junction Rail 163 km 1.24 2h 38m
Interchange at Merrow Junction 1h 30m
2 Merrow Junction → Ashport Deepwater Rail 216 km 1.22 3h 29m
Discharge and release at Ashport Deepwater 2h 00m

Of that total, 1h 30m is spent standing still under a crane rather than moving — 12% of the door-to-door clock. Cutting a lane's transit almost never means running faster; it means taking a lift out of it.

Corridor 12 runs agricultural export from the eastern arable belt to the deep-sea berths at Ashport, and it is the one service where we publish two timetables instead of pretending there is one.

Between August and November it is daily. Out of season it is three times a week. Halgate’s busiest month moves more than three times what its quietest does, and a flat schedule would mean either a half-empty train for eight months or a queue at the gate for four.

Twenties, not forties

Grain is dense. A 40ft container carrying it hits the 26,730 kg payload limit at around 40% of its cubic capacity — the box is two-fifths full and legally finished. A 20ft unit carries 28,250 kg in half the volume, so the same tonnage travels in fewer, fuller boxes. This is what the load planner on the equipment page means by weighing out, and it is the single most expensive thing a first-time exporter gets wrong.

On-time performance

92.4% is the lowest figure on the network and we publish it rather than quietly leaving this lane out of the average. Harvest volume is weather-bound, arrives in surges, and the Halgate gate closes at 22:00. We would rather show the number and explain it.

Equipment on this service

20ft GP for grain and pulses. Ventilated units on request.

LB-02 Book this service